Healthcare laundry and sterile processing plant, shown as an illustration of the workflow. Building shell and columns are from the 2020 as-built drawing; equipment positions are approximate and shown as if in service. Rails, sling positions and support steel are from the ETECH as-built drawing. Equipment conveys as-is.